首页

  1. 首页
  2. 结构施工
  3. 内容

钢结构篮球馆工程施工组织设计

  • 资料大小:57 KB
  • 运行环境:NT/2000/XP/2003/Vista
  • 资料语言:简体中文
  • 资料评级
  • 授权形式:资料共享
  • 更新时间:2019-11-19 15:17
  • 发布作者:老司机带你飙车
  • 插件情况 无插件,请放心使用
  • 文件类型 RAR
  • 解压密码:civilcn.com
  • 安全检测 瑞星 江民 卡巴斯基 金山
介绍: 该工程为篮球馆工程,本工程檐口标高为10.5m,建筑面积为1260M2,结构使用年限50年,抗震设防重要性为丙类,设防烈度为7度,设计基本地震加速度0.15g,设计地震分组为第二组,场地类别为Ⅱ类,地面粗糙度B类,结构安全等级二级,耐火等级为二级,地基基础设计等级丙级,砌体施工质量控制等级为B级。主钢构梁柱钢材选用Q235B钢,屋面板采用75mm厚950型EPS夹心板,外板为蓝色,内板为白色。标高1.2000m以下为砖墙,标高1.2000m以上墙体采用双层Q90型单板夹50mm厚保温棉,内板0.4mm,外板0.5mm,内外板均为白色。 目录 1 施工组织设计编制说明与工程概况···········································12 1.1施工组织设计编制原则和依据···········································12 1.2工程概况·························································12 1.3工期目标·······················································13 1.4工程质量目标··················································13 1.5安全目标·····················································13 1.6文明施工目标··················································13 2 工程进度计划及材料供应········································14 2.1主要用材·····················································14 2.2工程进度计划安排·····················································14 2.3材料供应计划·····················································14 3施工组织管理···························································15 3.1项目管理组织机构和主要施工管理人员配置·······························15 3.2施工管理准备工作·····················································16 3.3施工队伍进场筹备工作·················································17 3.4劳动力配置·················································17 3.5机械设备配置·················································17 4主要施工方法·······················································18 4.1土建施工·················································18 4.2构件的预制和运输·················································18 4.3钢结构安装·················································24 4.4油漆、防火涂料的施工·················································26 4.5彩钢板安装·················································26 4.6其他工程·················································26 5施工过程管理·······························································27 5.1流水作业施工·················································27 5.2物资采购供应·················································27 5.3做好施工过程的协调配合工作···········································28 5.4做好服务工作措施·················································29 5.5做好工程资料管理措施·················································29 6工期、质量、安全、环保、文明施工等保证措施·····································29 6.1工期保证措施·················································29 6.2质量保证措施·················································29 6.3安全生产保证措施············································32 6.4文明施工管理措施·················································33 6.5环保管理措施·················································33 6.6安全防火管理措施············································33 6.7现场临时施工用电管理措施·············································34 6.8工程节约措施·················································35
点击进入下载 (需要 0 积分)

相关文章

回到顶部
请复制以下网址分享
钢结构篮球馆工程施工组织设计
http://m.civilcn.com/jiegou/jgsg/15741478251057996.html